Post-construction clean-up
New build-outs leave a fine dust that settles for days and gets into everything. We do the rough clean, the detail clean, and the final pass right before the furniture arrives.

What’s included
- Rough clean: debris removal, sweeping, protective film and stickers off
- Detail clean: HEPA vacuuming of all surfaces, ledges, ducts and light fixtures
- Windows, glass and frames, inside
- Cabinets and drawers inside and out
- Restrooms and kitchens sanitised for first use
- Final pass after furniture delivery
How it’s scheduled
Booked to the contractor's completion date with a day of float. Usually two to four days of work depending on square footage. Can be a one-off or the first job of a nightly contract.
Who it’s for. Tenants moving into new space, general contractors, property managers between tenants.
We had three cleaning companies in four years. The problem was never the first month, it was month six. Same crew for two years now, and the report every morning means I know what happened before anyone complains.
Often added alongside
- Nightly janitorial
Desks, kitchens, restrooms and floors, every night after your team leaves.
- Day porter
Someone on site during the day for lobbies, restrooms and whatever comes up.
- Floor care
Strip and wax, carpet extraction, terrazzo and stone, on a calendar rather than when it looks bad.
Get a fixed price for post-construction clean-up.
A walkthrough takes about 30 minutes. We come before 9 a.m. or after 5 p.m. so we're not in your team's way, and you have a written price within two business days.